2011-09-21

Meetings are monthly every third Wednesday of the month at 11:30 AM Eastern time.
Conference call is handled by Calliflower: Dial in Number: +1 218 936 6581  click here for more call-in numbers

To access the conference call, click here.

Attending: Susan, Cris (will be late), Tuy, Tim
Absent: Steve, Benito

To Do from August 31.

  • Susan talk to Tom Barton / Benno wrt alignment of OR with new venture to fill gaps in IDM (tick)
  • Benito talk to Tom about IT ecosystem.Make unsponsored contribution?  Would he rather leave it as U Chicago offering? (tick)
  • Susan flesh out Conceptual - Product Suite Style Governance as proposal to board.
  • Susan review new website pages pages and spiff them up - perhaps get new icon / logo.

Sakai / Jasig merger impact on incubation

Susan talked with Patty 9/15. 

  • Sakai projects somewhat nervous because prior effort within Sakai failed.  It was very top down. However they are are also very hopeful and incubation is seen as a main attraction for the merger.  (!)
  • Licensing is likely to change - at least the name of the new foundation vs Jasig. 
  • There may be adjustments to incubation process to accommodate concerns or new aspects in Sakai projects.
  • All existing projects will have to re-align with new criteria such as licensing, voting, governance.  We are not forcing them all to go through incubation again but we do want all sponsored projects to comply with new criteria.
  • Tom Barton has offered to help with transition of incubation process to new foundation.  Concern over desire to engage more IT leaders to foster incubation and community.
  • Possibly engage people higher up in organization to identify units of work and resources.  Possibly a community of interest.

Jasig incubation is weakened by difficulty being effective in some areas:

  • Finding right level of governance.
  • Helping project create /  build community

(star) Susan email board and talk to Tom Barton about how / when to start the process of engaging Sakai in adjusting incubation process to accommodate their concerns.

Incubator Status

ID

Name

Assignee

Project Lead

Comments / Status September 2011

INC-6

Bookmarks Portlet

Benito J. Gonzalez

Eric Dalquist

Emailed Eric -- no response yet

INC-29

IT Ecosystem

Benito J. Gonzalez

Justin Montgomery

Emailed Tom about making this an unsponsored contribution or leaving it at U Chicago -- no response ye.  Recommend to board when we know.

INC-28

Confluence Portlet and Plugin

Benito J. Gonzalez

James Kionka

James will be adding build documentation and should have a CSS update soon.

INC-7

Functional Tests Portlet

Cris Holdorph

Eric Dalquist

Eric should have more time soon

INC-38

Exchange Mail and Calendar Portlet

Cris Holdorph

Charles Frank

developer ICLAs still needed

INC-26

Spring Portlet MVC JSR-168 Archetype

Cris Holdorph

Charles Frank

developer ICLAs still needed

INC-15

Content Management Portlet

Cris Holdorph

Misagh Moayyed

Misagh will be Unicon employee soon.  Expect more follow up.

INC-30

Self Service Accounts Portlet

Steve Swinsburg

Andrew Petro

Still have not had any reply (since April this year, and subsequent emails each month)

INC-40

Basic LTI Portlet

Steve Swinsburg

Steve Swinsburg

Need to get source into repository, I believe the licensing is in order?

INC-23

Sakai connector

Steve Swinsburg

Steve Swinsburg

Need to get source into repository, I believe the licensing is in order?

INC-9

OpenRegistry

Susan Bramhall

Benn Oshrin

Active discussions about registries as an outcome of initiative to do work to fill gaps in OS IDM landscape.  Jeremy has been participating.  This could be good news for long term sustainability of OR and for general health and activity of the project.

INC-11

esup-helpdesk

Susan Bramhall

Pascal Aubry

No work came out of the conference.  Gary / Susan suggest recommending to board that this become an unsponsored contribution.  Not sure if this makes sense since project id not housed in Jasig (I think).  Need to explore what this would mean.

INC-36

uMobile, A Native Mobile App for uPortal

Susan Bramhall

Jennifer Bourey

uMobile 1.0 GA this week.  All requirements fulfilled except diverse community and adopters.  No real harm in leaving to incubate until we have at least one adopter.

INC-39

Simple RSS Portlet

Susan Bramhall

Steve Swinsburg

uMobile phase 2 will update NewsReader.  Jen still intending to talk to Steve about combining.  Comments, Steve?

INC-35

ThinkSpace

tim carroll

Pete Boysen

Addressing issues on several fronts.  Pete met with the university lawyers.  On the surface the agreements don't seem to cause any problems but they need to check the existing NSF, USDA and Dept of Ed grants to make sure there are no problems.  Hopefully done in the next two months but you know lawyers.

Pete met with the faculty to discuss growth and dissemination.  While JASIG will be good for technology management they are unsure about faculty training and development.  Associating with Sakai might change that but those conferences tend to be technology-focused rather than faculty-focused.  He may need to take another tact for that.  Any thoughts would be appreciated.

Finding additional programmers is going to be the biggest hurdle, which Pete knew would be the case.  He is getting other institutions on-board but they tend to come out of departments, not central IT.  With budgets the way they are, they are not inclined to provide funding or staff.  Pete has tried CS grad students funded through grants but that has not worked well.  2 FTEs would be ideal, one for Java programming and one for Java UX design but less would be ok.

INC-22

Deployer Portlet

tim carroll

Andy Gherna

I asked Andy to contact Eric Dalquist about including the deployer portlet in uP4

INC-27

Xythos Portlet and Plugin

tim carroll

James Kionka

Added license headers to code, and added screen shots to project wiki.  Waiting on shared CSS work to conclude build documentation.

INC-16

Search Portlet

Tuyhang Ly

Jennifer Bourey

Susan email sent to Jen - no response

INC-17

Widget Portlets

Tuyhang Ly

Jennifer Bourey

Susan email to Jen - no response

INC-37

Scheduling Assistant

Tuyhang Ly

Nicholas Blair

Bedework committee is willing but need to explore with Nick.  He did not originally like this idea.  Not sure why.

Prior Status

ID

Name

Assignee

Project Lead

Comments / Status Aug 2011

INC-6

Bookmarks Portlet

Benito J. Gonzalez

Eric Dalquist

Eric still on uP 4.0

INC-29

IT Ecosystem

Benito J. Gonzalez

Justin Montgomery

Maybe make this unsponsored contribution. (star) Benito ask Tom whether to do this or leave it as U Chicago offering.

INC-28

Confluence Portlet and Plugin

Benito J. Gonzalez

James Kionka

James has not had time to work on it recently.  Has it on radar screen but not sure when work will start again.

INC-7

Functional Tests Portlet

Cris Holdorph

Eric Dalquist


INC-38

Exchange Mail and Calendar Portlet

Cris Holdorph

Charles Frank


INC-26

Spring Portlet MVC JSR-168 Archetype

Cris Holdorph

Charles Frank


INC-15

Content Management Portlet

Cris Holdorph

Misagh Moayyed


INC-30

Self Service Accounts Portlet

Steve Swinsburg

Andrew Petro


INC-40

Basic LTI Portlet

Steve Swinsburg

Steve Swinsburg

 

INC-23

Sakai connector

Steve Swinsburg

Steve Swinsburg


INC-9

OpenRegistry

Susan Bramhall

Benn Oshrin

See July status and to do.

INC-11

esup-helpdesk

Susan Bramhall

Pascal Aubry

See July status and to do.

INC-36

uMobile, A Native Mobile App for uPortal

Susan Bramhall

Jennifer Bourey

Hoping to cut the uMobile GA right after the uPortal GA.  Once that is done it can graduate.  All requirements fulfilled except diverse community and adopters.  Maybe need adoption to graduate?

INC-39

Simple RSS Portlet

Susan Bramhall

Steve Swinsburg

Jen suggests waiting a bit more and give us a chance to consolidate on one project. When Steve created his portlet, he wasn't aware of the simpler configuration options in the news reader portlet, and the news reader portlet is being distributed by default as of uPortal 4. Particularly since we're distributing an RSS reader with the portal, it'd probably be best to just get all the features we want into one portlet. There's really no technical reason to have two portlets, and Jen integrated in the few features that I saw in his portlet that were missing from the NRP.

INC-35

ThinkSpace

tim carroll

Pete Boysen

ThinkSpace wiki content was migrated to jasig (TSC).  Pete's doc staff have been busy on the site, and they will be having a discussion with faculty on Aug 3 to flesh out more of the documentation.  Pete is working on intro, scope and roadmap.  The phrase "federal grant funding" has introduced some additional churning in the approval of contrib agreements.  They are ready to commit code when that is resolved.

INC-22

Deployer Portlet

tim carroll

Andy Gherna

no change.

INC-27

Xythos Portlet and Plugin

tim carroll

James Kionka

Received open source licensed code from Xythos/Blackboard for required code snippets:https://files.xythos.com/company/Product%20Management/Releases/Open%20Source%20Code/XythosActionLicense2011%231.java

Added feature sheet to wiki: https://wiki.jasig.org/display/PLT/Xythos+Portlet|display/PLT/Xythos+Portlet||||||||||||\

INC-16

Search Portlet

Tuyhang Ly

Jennifer Bourey

no change.  (star) Susan talk to Jen!!!

INC-17

Widget Portlets

Tuyhang Ly

Jennifer Bourey

Still no official release.  RC2 and RC3 but ready for GA soon.

INC-37

Scheduling Assistant

Tuyhang Ly

Nicholas Blair

Roadmap under construction and looking to connect to jira.  Currently blocked from a 1.0 release by https://issues.jasig.org/browse/SA-1 pending on a release from Bedework. Project now has sponsor Gary Schwartz.  Should governance be by Bedework?  (star) Susan talk to Gary.